two questions were asked: 1: to find the no of connected components in the graph with the value of of 1 in the 2D array consisting of 0 and 1 2:in the array given of consisting of any numbers like positive,negative and zero and constant T given we need to find how many contiguous segment are there having the sum exactly T.
Round 1(Technical):
Question 1: Introduce yourself Question 2: Tell me about the project you mentioned in the intro and further asked to draw model diagrams explaining the project like what modules you are using and where storing and all Question 3:write an sql query to insert some data in any rows Question 4:what is context switching?What is basically changes like full description? Question 5:The Problem: The Two-Strike Array Search The Setup: You are given a hidden, sorted boolean array of length N. The array consists of a continuous prefix of 0s followed by a continuous suffix of 1s (e.g., [0, 0, 0, 0, 1, 1, 1]). The Goal: Find the exact index k where the first 1 appears. The Constraints (The Catch): You have an API function get(index) that returns the value at that index, but it is heavily restricted: Total Query Limit: You can call get(index) a maximum of 150 times. The "Strike" Penalty: If get(index) returns 0, there is no penalty (you can hit 0s infinitely). However, if get(index) returns 1, you take a strike. You are allowed a maximum of two strikes. If you hit a 1 for a third time, the API breaks and you fail. Link to problem: https://leetcode.com/problems/egg-drop-with-2-eggs-and-n-floors/description/?hl=en-GB
Read this R&D Intern interview experience at Samsung.
Last updated Oct 8, 2026
HR Round
Q. Asked me to first introduce myself, then asked about family members, where do you live, my jee rank and from which category I secured the rank, why iit patna, why my current branch, etc.
Q. Why do you want to work for Samsung?
Q. Tell me about yourself anything other than what is in your resume. Any particular hobbies/interests.
Q. Then he looked at my projects and asked me why I made this? Is this a group or solo project? Then I explained my project overview.
Q. What are your future goals?
Q. Then he asked me about my high school and what my favorite subject was. (I said mathematics and then he continued with few puzzle questions : )
i) Given a cake divide it into 8 pieces in 3 cuts
Ans: (2 cuts and then align them properly make the last cut)
ii) A monkey in day jumps 3 m and then slides 2m on which day does that reach 30 m height Ans: (28 days)
After a few random talks, he asked if I had any questions for him.